The fixture in the factory is easy to be damaged and deformed, and it is too heavy to use, which is easy to cause personnel burden. The number of fixtures in the old design is too large in volume/weight, and the number of oven devices is limited according to the specification, which affects the product operation. After the old fixture is discharged from the oven, the cooling stop time is too long, and the cycle time of the finished product in PMC process is too long. The ability to improve the Warpage of the product is poor.